Site Identification (-210 Days)

A 100-point scorecard weighted power cost, zoning, latency, and expansion acreage. GridSite shortlisted three parcels; this one topped the list with a Level-4 power-availability badge.

Permits Secured (-160 Days)

Environmental assessments, water-use studies, and load-interconnection requests were filed through ComputeComplete’s Docs module. Comment cycles tracked automatically; deadlines surfaced to the permits Kanban.

Groundbreaking (-150 Days)

24/7 site-cam time-lapses feed into a public investor microsite. Critical path tracked with float alerts; equipment lead-times auto-adjusted as supply-chain ETAs shifted.

Commissioning Complete (-5 Days)

Integrated systems test: 72-hour full-load generator run, CRAH step-tests, zero-downtime UPS cutovers. All points logged at 1 Hz into ComputeComplete’s historian.

Operations Day 0

NOC acceptance, SLA baselining, and customer onboarding went live the same day. Tenants received per-rack Grafana dashboards, while Northfield staff monitor fleet-wide PUE and coolant ΔP.

GridSite Logo
«A Simulated Build Timeline. Each milestone shown here would originate as a task in ComputeComplete’s Deploy Gantt chart. The platform would sync this data bidirectionally with a PowerBI dashboard for stakeholder reporting.»